Rib Construction
Posted: Tue Sep 05, 2017 9:59 am
Can anyone shed some light as to where they placed the extra bracing required for the 4 end ribs as shown in the plans. It appears to be required for the longest truss cross member behind the rear spar and at 90 degrees with gusset reinforcement. Is the intersection at some generally accepted point (say half way) on this crossmember ? Thanks. ELB.