Pietenpol-List: to the plans...

An archive of the Matronics Pietenpol Listserve.
Locked
matronics
Posts: 81779
Joined: Sat Mar 18, 2017 8:29 am

Pietenpol-List: to the plans...

Post by matronics »

Original Posted By:
I've been working on my wing.. leading and trailing edges..I kept thinking the idea of 8-32 screws holding on the leading edge sounded kindasilly..after roughly shaping it and clamping it in place a few times, it hit me..i would need at least 28 clamps to hold that thing in place... or DUH..do it like bernard did..so i clamped it.. drilled it glued it then screwed it on.. the screws pull it downtight and keep it in from sliding out of place all at the same time..looks like a wingjeffRead this topic online here:http://forums.matronics.com/viewtopic.p ... __________
Locked